2016 NGRM/ExpoNG Dave Brewer Challenge (6)

ngrm 2016 brewer plan

Thanks to the members on NGRM On-Line for their comments and suggestions.

I have been experimenting with the positioning and gradient as well as a baffle at the bottom end. The chute is already as low as it will go, it allows wagons but not locos to pass beneath it so a stop board will be needed!


The other thing holding up work on the mine at the moment was referred to yesterday, I still need to get some more wriggly tin before cladding the building.


In the meantime I’ve been concentrating on the rock formations and the bridge but I have just run out of filler as well!


stop board


About Bob Hughes

Ex railwayman, life long railway modeller, lover of real ale and spicy food.
This entry was posted in 2016 Dave Brewer Challenge, Bodging and Kitbashing, My trains, Narrow gauge, Toy train chit chat. Bookmark the permalink.