Plastered

How to get plastered on a Friday night, without touching a drop of alcohol!

plastered

The rock face of the river gorge and around the tunnel are looking better after a bit of work on the module last night. I’ll let this set fully over the weekend before returning to complete the shaping of the tunnel mouth and will concentrate on plastering the areas around the bridge and mine when I get home from work this evening.

I’ve got a few hours free this morning which will be spent searching for about a foot of leftover N gauge track to fit into the adit then fastening the bits of scrap wood together as the base for the mine scene. Who said railway modelling was an expensive hobby? Stop opening boxes and make something for yourself.

You might enjoy it.

stop

Advertisements

About Bob Hughes

Ex railwayman, life long railway modeller, lover of real ale and spicy food. Divorced, three kids, one dog.
This entry was posted in Bodging and Kitbashing, My trains, Narrow gauge, Toy train chit chat. Bookmark the permalink.